HOMEWHO WE ARE
WHAT WE DO
ASI SoftwareCondition AssessmentsAM Renewal ProgramsAM Policy, Strategy, Roadmap, & PlansOwner's Engineer & Project Management
WHERE WE WORK
MunicipalitiesOil & GasElectricalTransportationEducational InstitutionsGovernment FacilitiesTelecommunications
PROJECTSCONTACT USASI SOFTWARE LOGIN

Steel Pole Infrastructure Built for Safety, Strength, and Long-Term Reliability

Inspect. Protect. Prevent Failure.

Check Out ASI’s Projects

Turning Steel Pole Deterioration into Clear Risk-Based Decisions

Steel, concreate, or wooden poles are exposed, load-bearing assets where corrosion, section loss, cracked welds, loose connections, foundation movement, and impact damage can quickly become public safety risks. ASI delivers engineering pole condition assessments that identify deterioration before it leads to structural failure, service disruption, or emergency replacement. Our assessments turn field findings into clear repair priorities, replacement planning, and defensible capital decisions that help clients reduce risk, extend service life, and keep critical infrastructure standing strong.
Field inspection of structural members and access conditions.
Field inspection of structural members and access conditions.
Field inspection of structural members and access conditions.
Field inspection of structural members and access conditions.
Field inspection of structural members and access conditions.
Field inspection of structural members and access conditions.
Field inspection of structural members and access conditions.
Field inspection of structural members and access conditions.
Backfill restoration right after excavation
Backfill restoration right after excavation
Site surface review for drainage, cracking, and settlement.
Site surface review for drainage, cracking, and settlement.
Site surface review for drainage, cracking, and settlement.
Site surface review for drainage, cracking, and settlement.
Site surface review for drainage, cracking, and settlement.
Site surface review for drainage, cracking, and settlement.
Concrete surface review for cracking, spalling, and exposure.
Concrete surface review for cracking, spalling, and exposure.
Concrete surface review for cracking, spalling, and exposure.
Concrete surface review for cracking, spalling, and exposure.
Concrete surface review for cracking, spalling, and exposure.
Concrete surface review for cracking, spalling, and exposure.
Pole base review for corrosion, cracks, and exposure.
Pole base review for corrosion, cracks, and exposure.
Darren Wiebe, Project Director / Principal Engineer (EGBC P.Eng.), , was onsite to conduct inspections
Darren Wiebe, Project Director / Principal Engineer (EGBC P.Eng.), , was onsite to conduct inspections
Handhole access review for corrosion and fit-up.
Handhole access review for corrosion and fit-up.
Tools & Equipment
Tools & Equipment
Field review for pole defects and repair needs.
Field review for pole defects and repair needs.
Coating wear review for corrosion protection.
Coating wear review for corrosion protection.
Access hardware review for fit, corrosion, and safety.
Access hardware review for fit, corrosion, and safety.
Field overview of pole condition and access.
Field overview of pole condition and access.
LV-5 proof testing for contact voltage screening.
LV-5 proof testing for contact voltage screening.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Streetlight pole review for defects, access, and safety.
Field setup review for access, equipment, and site safety.
Field setup review for access, equipment, and site safety.
Contact voltage screening for public and worker safety.
Contact voltage screening for public and worker safety.
Contact voltage screening for public and worker safety.
Contact voltage screening for public and worker safety.
What We Do
Condition AssessmentsAM Renewal ProgramsAM Policy, Strategy, Roadmap, and PlansOwner's Engineer & Project Management
Saskatchewan
(Head Office)
+1 (306) 565-0789
4270 Buckingham Drive E.
Regina, SK S4V 3Y9
Alberta
+1 (587) 315-1616
3909 University Ave NW
Calgary, AB T3B 6K3
British Columbia
+1 (604) 259-4248
1771 Robson Street
Vancouver, BC V6G 3B7
Our Offices
info@asiengineering.ca
© 2026 ASI-Asset Strategy Inc. ("ASI Engineering"). All rights reserved.
Proudly serving our clients across Canada.
Darren Chatbot
Darren - Your Asset Management Expert Darren - Your AM Expert